CNCzone.com-The Largest Machinist Community on the net!



Home Page Mark Forums Read Today's Posts My Replies Classifieds Reviews Photo Gallery Web Links Share Files Advertise With Us Ad List
Go Back   CNCzone.com-The Largest Machinist Community on the net! > MetalWorking Machines > General Metal Working Machines


General Metal Working Machines General discussions of all metal working machines from drill presses to band-saws.


This forum is sponsored by:

Reply
 
LinkBack Thread Tools Search this Thread Display Modes
  #1   Ban this user!
Old 07-06-2007, 09:37 AM
 
Join Date: Jan 2007
Location: USA
Posts: 497
tikka308 is on a distinguished road
Setup Question

As a newbie, I'm finding the forum threads incredibly helpful! I've also been watching Darrell Holland's VMC DVD course.

I have a question that, although basic, I can't seem to find an answer on the forum:

When you have your CNC program/code ready for the part and you put the part in the vice, how does the mill know where the part is located? I.e. each time you put a part in the vice, I'm sure it's going to be, at best, a few thousands left or right of the last time...

Thanks!
Tweet this Post!Share on Facebook
Reply With Quote

  #2  
Old 07-06-2007, 10:35 AM
Gold Member
 
Join Date: Oct 2005
Location: USA
Posts: 647
Caprirs is on a distinguished road
If you need the part located so accurately, put a rigid "stop" on one side and consistently place the part against the stop. The part must still be positioned the same way every time. Different people will have a variance of ~.001" due to differing hand pressure while closing the vise.

This is a fancy one. Some clamp to the vise fixed jaw. They are available from MCS and Enco. Often, shops make their own to suit their needs.
Tweet this Post!Share on Facebook
Reply With Quote

  #3   Ban this user!
Old 07-06-2007, 10:43 AM
The Blight's Avatar  
Join Date: Sep 2006
Location: Denmark
Age: 26
Posts: 556
The Blight is on a distinguished road
The mill knows where the part is located when you have used an edgefinder. If you want a consistant zero, you will have to use stop like the one Caprirs posted.
Tweet this Post!Share on Facebook
Reply With Quote

  #4   Ban this user!
Old 07-06-2007, 11:11 AM
 
Join Date: Jul 2005
Location: Canada
Posts: 11,419
Geof will become famous soon enough
You use a stop like caprirs showed so that each part is put in the vise in the same position.

But before running the first part you have to enter what are called Work Coordinates, or the Work Zero, into the machine and this is what The Blight is referring to in mentioning an Edge Finder.

Your CNC program is based on a zero point somewhere on the part, this is the Work Zero; it could be a corner of the part. The machine operates using machine coordinates and when the machine is homed or zeroed it automatically moves to the zero point in these coordinates. Normally this means the table moves as far forward as possible and to the left as far as possible with the spindle as high as possible. By convention all machine motion from this point is considered negative motion on any axis and while the table actually moves for X and Y we say that the spindle is moving negative X when the table is moving toward the right and similarly when the table moves away from the operatore we say the spindle is moving negative Y. Z is easeir to picture; the spindle moving down is negative Z.

So if your part Work Zero is at the corner it is necessary to know the location of this corner in machine coordinates; that is the X and Y coordinates when the centerline of the spindle is above this point. These are the Work Coordinates which are entered into a table in the machine controller and called G54, G55, etc. The most common default choice is G54.

The Edge Finder, or some other method is used to position the spindle at the Work Zero in order for these coordinates to be located. Basically with an Edge Finder you have a probe with a known diameter that you bring into contact with the edge of the part and then move the machine an additional distance equal to half the diameter so now the center is in line with the edge. Do this for both X and Y and you have the center of the spindle over the corner.

The Z coordinate can be located either by using a Work Coordinate entry or by using a Tool Offset. The important thing is that you need to know the position of the tip of the tool relative to the top of your part. The machine Z coordinate for this is going to be different for different tools because they will be different lengths so Tool Offsets are used for each tool but a Z Work Coordinate may also be used in combination with Tool Offsets.

To determine the Tool Offset the tool is brought down until it is just touching the top of the part and the value of this location in machine coordinates on the Z axis is entered into the Tool Offset table in the machine controller.

Now your machine "knows" where your part is.

I apologise if this explanation is more long-winded than you where looking for.
__________________
An open mind is a virtue...so long as all the common sense has not leaked out.
Tweet this Post!Share on Facebook
Reply With Quote

  #5   Ban this user!
Old 07-06-2007, 05:05 PM
The Blight's Avatar  
Join Date: Sep 2006
Location: Denmark
Age: 26
Posts: 556
The Blight is on a distinguished road
You can also use one of these 3D tasters (edgefinder with 3rd axis)
This one costs about $160

You can also make one yourself as I'm doing. I might be able to post some drawings of it in about a month or so. It's made of stainless steel and uses a regular dial gauge. All the tolerances are H7, so you need some good machines to make it, but it should work quite nicely. Not as accurate as one you can buy, but I guess +/- 0,01mm (0,00039) is do-able.

Tweet this Post!Share on Facebook
Reply With Quote

Sponsored Links
  #6   Ban this user!
Old 07-06-2007, 05:54 PM
Mitsui Seiki's Avatar  
Join Date: Feb 2007
Location: USA
Posts: 464
Mitsui Seiki is on a distinguished road
Originally Posted by Geof View Post

To determine the Tool Offset the tool is brought down until it is just touching the top of the part and the value of this location in machine coordinates on the Z axis is entered into the Tool Offset table in the machine controller.

.
Unless you have a tool presetter:
http://www.inspection.ie/shopping_ad...l%20Presetters

They measure both length and radius of the tool.
All you have to do is read the meter and write the value in Tool offset.
Tweet this Post!Share on Facebook
Reply With Quote

  #7   Ban this user!
Old 07-06-2007, 06:41 PM
 
Join Date: Jul 2005
Location: Canada
Posts: 11,419
Geof will become famous soon enough
Correct, Tool Setters and Probe Systems can be used. I was trying to answer in what appeared to be the context of the query in an introductory sense. It does not matter how you do it you are telling the machine the location of a reference point on the part. I think for a novice it is better to answer questions at an introductory level and not expect them to know the jargon of the trade yet.
__________________
An open mind is a virtue...so long as all the common sense has not leaked out.
Tweet this Post!Share on Facebook
Reply With Quote

  #8   Ban this user!
Old 07-06-2007, 06:50 PM
Mitsui Seiki's Avatar  
Join Date: Feb 2007
Location: USA
Posts: 464
Mitsui Seiki is on a distinguished road
Ok, you have a point there.Your explanation was perfect,I just added an another way to do it.
Tweet this Post!Share on Facebook
Reply With Quote

  #9   Ban this user!
Old 07-09-2007, 11:45 AM
 
Join Date: Jan 2007
Location: USA
Posts: 497
tikka308 is on a distinguished road
Thanks! You guys rock.
Tweet this Post!Share on Facebook
Reply With Quote

Reply




Currently Active Users Viewing This Thread: 1 (0 members and 1 guests)
 
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Setup question obscurity PicStep Controllers 5 01-14-2007 03:05 PM
Setup Question buddym DIY-CNC Router Table Machines 6 11-19-2006 08:52 AM
Newbie Question on Setup buddym Mach Mill 3 11-10-2006 08:20 PM
Dumb setup question holedpiston Fadal 7 10-16-2006 07:23 PM
Another Setup Question... rcazwillis TurboCNC 4 07-04-2005 10:55 AM




All times are GMT -5. The time now is 12:52 PM.





Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2012, vBulletin Solutions, Inc.
Content Relevant URLs by vBSEO
Template-Modifications by TMS

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136 137 138 139 140 141 142 143 144 145 146 147 148 149 150 151 152 153 154 155 156 157 158 159 160 161 162 163 164 165 166 167 168 169 170 171 172 173 174 175 176 177 178 179 180 181 182 183 184 185 186 187 188 189 190 191 192 193 194 195 196 197 198 199 200 201 202 203 204 205 206 207 208 209 210 211 212 213 214 215 216 217 218 219 220 221 222 223 224 225 226 227 228 229 230 231 232 233 234 235 236 237 238 239 240 241 242 243 244 245 246 247 248 249 250 251 252 253 254 255 256 257 258 259 260 261 262 263 264 265 266 267 268 269 270 271 272 273 274 275 276 277 278 279 280 281 282 283 284 285 286 287 288 289 290 291 292 293 294 295 296 297 298 299 300 301 302 303 304 305 306 307 308 309 310 311 312 313 314 315 316 317 318 319 320 321 322 323 324 325 326 327 328 329 330 331 332 333 334 335 336 337 338 339 340 341 342 343 344 345 346 347 348 349 350 351 352 353