![]() | |
| Home Page | Mark Forums Read | Today's Posts | My Replies | Classifieds | Reviews | Photo Gallery | Web Links | Share Files | Advertise With Us | Ad List |
| |||||||
| General CNC (Mill and Lathe) Control Software (NC) General Discussion of CNC (Mill and Lathe) control software here! |
| This forum is sponsored by: |
![]() |
| | LinkBack | Thread Tools | Search this Thread | Display Modes |
|
#1
| |||
| |||
Hi, Am wanting to engrave some text amongst other tasks and am unsure on how to set up Mach 3 (demo) to allow me during the program run after the first cut to lift the z axis before moving (jogging) to another part of the work and then dropping again to allow further cuts. I presume you can set this as opposed to manually editing the g code. At present my z axis stays at the same height throughout the whole program (jogging included). My file imports are dxf. Any advice? Cheers, Shamus |
![]() |
| Currently Active Users Viewing This Thread: 1 (0 members and 1 guests) | |
| Thread Tools | Search this Thread |
| Display Modes | |
| |
Similar Threads | ||||
| Thread | Thread Starter | Forum | Replies | Last Post |
| Setting Z axis with G92 work shift | venomgrrrl | Fanuc | 12 | 12-03-2007 11:02 AM |
| Setting up Z axis tool holder height above table | EL34 | DIY-CNC Router Table Machines | 3 | 07-27-2007 03:28 PM |
| loosing z axis zero setting | contractdesign | Bridgeport and Hardinge Mills | 6 | 09-02-2006 07:28 PM |
| Setting Zero | wjbzone | TurboCNC | 7 | 01-03-2004 04:25 PM |
| 3 Axis Lathe/MillTurn Setting Times | atmosports | General Metalwork Discussion | 1 | 12-07-2003 09:34 AM |