Interesting question! I'd like to know too.
What I do on drawings is, if it's hour and minutes then I separate them with a colon (eg 2h:30), if it's decimal then I separate with a full stop (eg 2.5hrs), but I dunno if that's right![]()
Hi All,
What is the unit expression of Estimated Machining Time in any CAM Software.
Is it Hours:Minutes
( If the time required is 3 hour 30 minutes, it would be expressed as 3.30 )
or Else
Hours:Hours.
( If the time required is 3 hours 30 minutes, the time would be expressed as 3.5 )
Thanks
Ash
Interesting question! I'd like to know too.
What I do on drawings is, if it's hour and minutes then I separate them with a colon (eg 2h:30), if it's decimal then I separate with a full stop (eg 2.5hrs), but I dunno if that's right![]()
I love deadlines- I like the whooshing sound they make as they fly by.
I checked it on CAM Software.
Its in the format -
Hours : Minutes
![]()