  #1   Ban this user!
Old 12-16-2011, 09:46 PM
 
Join Date: Dec 2011
Location: usa
Posts: 7
howdyall is on a distinguished road
Help with programming quotes

Greetings,

Been shopping a small part to be machined in Delrin. It measures about 1x.75x.25 -- fairly smooth geometry and described to us by a 5 axis shop as an easy part. The 3 axis shops say doable but need fixtures and indexer. There is a wide range in pricing for each part between shops and also a wide range in "programming" time pricing between shops. We are new to jobbing out machined plastic parts and are unfamiliar with your practices. Would anyone be so kind as to elaborate on why the discrepancies?

Is it not the case that the surf and mastercam programs or the like turnkey most of the programming set up time or is it as manually time consuming as we have been led to believe? Is programming time an area for negotiation and are these shops just testing our ability to sniff out a margin enhancer? We're getting from 2 hours to head scratching on programming times...

Thank you for your time in advance and look forward to your responses.

Ed.
Reply With Quote

  #2   Ban this user!
Old 12-18-2011, 06:51 PM
 
Join Date: Oct 2008
Location: USA
Posts: 6
6inall is on a distinguished road

Lots of possibilities why you are getting such a variation in pricing. Is it just the programing that is your concern or is it the overall cost of having the part(s) made?

Some information that I think would help would be:
A drawing or picture of the part(s).
Any critical tolerances.
Order quanity and expected delivery time.

Not sure who is giving you the higher prices, but.

The simplest reason I can think of is a 3 axis shop will have programming for fixturing AND machining with possibly several operations.

The 5 axis shops may say its an "easy" part, but the time it takes to setup those types of machines can be considerably more costly. Also, if the quantities are not high enough, they "could" be pricing like a short run or prototype.

Hope that helps some.
Reply With Quote

  #3   Ban this user!
Old 12-18-2011, 08:43 PM
 
Join Date: Mar 2008
Location: usa
Posts: 12
marine1775 is on a distinguished road

One other thing you need to realize is that you could send that part to 5 different shops and you will more than likely get 5 different ways to machine that same part.

The key is to find shops that machine parts in the most efficient manner utilizing the latest technology whether it be machines, cutting tools, software, or workholding principles.

But on the other hand I have seen parts that by the time the job got to the programmer then to the machine and the operator load the program set and load the tools I could have had a finished part completed by using manual equipment.

If your part is a 1/4" x 3/4" x 1" and is plastic 2hrs seems high to me unless it is more than 1!!

I am a Tool and Die Maker and a CNC Programmer. I could take a look at your part and give you an estimate of how long it should take.
Reply With Quote

  #4   Ban this user!
Old 12-19-2011, 08:55 AM
 
Join Date: Dec 2011
Location: usa
Posts: 7
howdyall is on a distinguished road

Programming and overall cost are a concern. Quotes aren't amortizing the programming time and show no reduction in cost per part even in volume. They are treating each part as a one off price which is simply outrageous. It's not a mil-spec part We find 2 hours of programming time somewhat reasonable but still on the high end due to the size of the part. Will keep shopping.




Originally Posted by 6inall View Post
Lots of possibilities why you are getting such a variation in pricing. Is it just the programing that is your concern or is it the overall cost of having the part(s) made?

Some information that I think would help would be:
A drawing or picture of the part(s).
Any critical tolerances.
Order quanity and expected delivery time.

Not sure who is giving you the higher prices, but.

The simplest reason I can think of is a 3 axis shop will have programming for fixturing AND machining with possibly several operations.

The 5 axis shops may say its an "easy" part, but the time it takes to setup those types of machines can be considerably more costly. Also, if the quantities are not high enough, they "could" be pricing like a short run or prototype.

Hope that helps some.
Reply With Quote

  #5   Ban this user!
Old 12-19-2011, 10:25 AM
WallyL7's Avatar  
Join Date: Dec 2008
Location: USA
Posts: 488
WallyL7 is on a distinguished road

Originally Posted by howdyall View Post
They are treating each part as a one off price which is simply outrageous.
LOL! It probably is a ONE OFF!!!!! Are you paying them up front for a high quantity of parts? If so, then they should give you a piece price with the programming/nre included in each piece...

but how do they know it isn't like every other customer out there telling them "This is going to take off. We just need the first one for free and you are going to be buried in quantities of these things"...

How about you post a drawing and some prices you've received. That would give us a better understanding of where this is coming from. For anybody to say that a small delrin part should be 2 hours is oblivious to complex geometry. Size has NO bearing on how long something may take.
__________________
Tim
Reply With Quote

Sponsored Links
  #6   Ban this user!
Old 12-19-2011, 12:12 PM
 
Join Date: Dec 2011
Location: usa
Posts: 7
howdyall is on a distinguished road

You know Tim -- That's the same attitude that sent your business over to China. Are 1000 pcs one off's? No. Are we paying up front? Could. Cash. Going to take off? No. Free? Grow up. Complex? No. Reread the original post. Post a drawing? Sorry no. We've done enough research on this part to know what it's worth. Just had a consultant programmer/machinist review the part. Not one aspersion you alluded to was confirmed.


And to close: Why don't you post a link to your website so we can make a note to steer clear in the future?


Originally Posted by WallyL7 View Post
LOL! It probably is a ONE OFF!!!!! Are you paying them up front for a high quantity of parts? If so, then they should give you a piece price with the programming/nre included in each piece...

but how do they know it isn't like every other customer out there telling them "This is going to take off. We just need the first one for free and you are going to be buried in quantities of these things"...

How about you post a drawing and some prices you've received. That would give us a better understanding of where this is coming from. For anybody to say that a small delrin part should be 2 hours is oblivious to complex geometry. Size has NO bearing on how long something may take.
Reply With Quote

  #7   Ban this user!
Old 12-19-2011, 12:31 PM
WallyL7's Avatar  
Join Date: Dec 2008
Location: USA
Posts: 488
WallyL7 is on a distinguished road

Way too funny. You were the one that said the prices were all over the place. You didn't post how many you were quoting, so one would assume you wanted one piece.

If you can get one done in 2 hours, then do it! I would say that for a shop to want to do your 2 hour job, then they must need work...and work done in China previously is FLOODING shops here in the USA again.

Simple on a 5 axis but needs fixturing and indexers on 4 axis machines is not normally a 2 hour job. Just to set up your 5 axis program is an hour -

Why don't you post the part and pricing? We already told you we would give you some insight to pricing. We would help if you really wanted it. What are you afraid of? I'm just giving you a bit of the other side here.

As far as growing up...hell no. That'll never happen.

You purchasers just keep trying to get stuff for free (programming, setup, etc) and some of us are tired of "free"....

If you want to steer clear of my website and other truths, here it is CNCzone.com-Machinist Community Forums - Welcome Page


Seriously, if it is that easy, then why are you having so much trouble with it?





Originally Posted by howdyall View Post
Is it not the case that the surf and mastercam programs or the like turnkey most of the programming set up time or is it as manually time consuming as we have been led to believe?

This seems to state you really don't know what I (or others here) do and that we are just trying to take advantage of you. I can assure you, we are just trying to make money like yourself.


Read what I wrote again. I assumed you were quoting one part. If not, I apologize. Please clarify it. I also assumed you don't want to pay for NRE - since you said nobody is amortizing the programming/etc over the part run. So, did you get a quote for 1000 pcs WITH programming and setup on top (like a one time fee)? Tell them you don't want to pay for that and they will revise the quotes (I do for my customers)...

Believe me, if you don't already know this...Purchasers are really into having suppliers quote 1,10,100,1000,10000 pcs - then ordering 4 or 9 pcs and asking for the 1000pc price and no NRE...It is a bit of a game, Ed. Just trying to give you some of our end. No offense...
__________________
Tim
Reply With Quote

  #8   Ban this user!
Old 12-19-2011, 12:44 PM
fizzissist's Avatar  
Join Date: Apr 2006
Location: USA
Posts: 2,364
fizzissist is on a distinguished road

Another cute trick is to get quotes on 10, 100, 500, 1000, 5000.....You get the order for 5000, then they cancel after getting a partial delivery of 500,,,, and expect that paying you for 500 based on the 5000/pc price is ok.

I ran a short run production job shop, and can tell you that 5 shops will bid 5 different rates. So? Each shop is unique, and in the old days, it wasn't unusual to get in a job and farm it out to another shop....and they were farming stuff out to you. We did that a lot, and everybody made money. ... Now, things are a bit different.

The cost and margins of the material alone can mean getting the job or not.

As for the programming....if you want to take possession of the program/code, expect to pay more. And don't expect that it may even do you any good.
Reply With Quote

  #9  
Old 12-19-2011, 12:51 PM
miljnor's Avatar
S.N.A.F.U.
 
Join Date: Jan 2005
Location: usa
Posts: 1,844
miljnor is on a distinguished road

It is a game with some customers Ed. He isn't trying to pull a fast one on you...just stating an unfortunate reality.

Information is always key when asking questions.

sometimes typed words have meanings applied to them that weren't intended.
__________________
thanks
Michael T.
"If you don't stand for something, chances are, you'll fall for anything!"
Reply With Quote

  #10   Ban this user!
Old 12-19-2011, 02:51 PM
 
Join Date: Dec 2011
Location: usa
Posts: 7
howdyall is on a distinguished road

I know you guys need to make money. But we already caught one shop trying to farm out our job after we required them not to. They quote high on their overhead then sub out to a garage shop and take a fat margin. The Chinese have caught on and are doing the same. If all you want to do is consult and sub then close shop and go offshore like everyone else. We've been treated like Typhoid Mary because we don't have a high margin DOD or Medical application. If some would rather quote a buyer out the door than break a sweat by all means do so. I don't believe for one minute that work is coming back from China. Most of the Medical Suppliers have offices over there and don't intend to return. Compete gentlemen. No one is asking you to take a Chinese wage either. But keep taking your customer for stupid and you will suffer the consequences. If you can afford to take work you can afford to quote fair. The sweet heart contracts are long gone. Suck it up. Our streets aren't paved with gold. 5 ways to build a part and 9 ways to skin a sucker buyer. Is that the new mantra? If you don't build standards into your system, someone else will. Build trash for automobiles and watch the foreign competition dominate. Treat your buyer like an Asian whore and watch them jump your ship in droves. The animosity between buyer and seller in your industry is blatantly obvious. Your equipment keep your hands tied not your buyers. The Chinese are subsidized. All of them. Instead of trashing your buyers you should be lobbying for cuts. Detroit and Wall Street got theirs. If your representatives lend you a deaf ear, vote the bast@rds out. We're all rowing the same boat. U.S. R&D centers started in garage shops. When access to R&D is gone so will access to the freedoms we take for granted.


Stop pointing fingers at Americans trying their best to contract work here. We could RFQ this part to China in a mouse click but that will only happen when Tim grows up. Never. And sadly a growing majority of buyers are opting for Tim's counterpart on Mainland China. Reverse the trend or flip burgers. Easy choice.


Originally Posted by fizzissist View Post
Another cute trick is to get quotes on 10, 100, 500, 1000, 5000.....You get the order for 5000, then they cancel after getting a partial delivery of 500,,,, and expect that paying you for 500 based on the 5000/pc price is ok.

I ran a short run production job shop, and can tell you that 5 shops will bid 5 different rates. So? Each shop is unique, and in the old days, it wasn't unusual to get in a job and farm it out to another shop....and they were farming stuff out to you. We did that a lot, and everybody made money. ... Now, things are a bit different.

The cost and margins of the material alone can mean getting the job or not.

As for the programming....if you want to take possession of the program/code, expect to pay more. And don't expect that it may even do you any good.
Reply With Quote

Sponsored Links
  #11   Ban this user!
Old 12-19-2011, 03:00 PM
WallyL7's Avatar  
Join Date: Dec 2008
Location: USA
Posts: 488
WallyL7 is on a distinguished road

Originally Posted by howdyall View Post
I know you guys need to make money. But we already caught one shop trying to farm out our job after we required them not to. They quote high on their overhead then sub out to a garage shop and take a fat margin. The Chinese have caught on and are doing the same. If all you want to do is consult and sub then close shop and go offshore like everyone else. We've been treated like Typhoid Mary because we don't have a high margin DOD or Medical application. If some would rather quote a buyer out the door than break a sweat by all means do so. I don't believe for one minute that work is coming back from China. Most of the Medical Suppliers have offices over there and don't intend to return. Compete gentlemen. No one is asking you to take a Chinese wage either. But keep taking your customer for stupid and you will suffer the consequences. If you can afford to take work you can afford to quote fair. The sweet heart contracts are long gone. Suck it up. Our streets aren't paved with gold. 5 ways to build a part and 9 ways to skin a sucker buyer. Is that the new mantra? If you don't build standards into your system, someone else will. Build trash for automobiles and watch the foreign competition dominate. Treat your buyer like an Asian whore and watch them jump your ship in droves. The animosity between buyer and seller in your industry is blatantly obvious. Your equipment keep your hands tied not your buyers. The Chinese are subsidized. All of them. Instead of trashing your buyers you should be lobbying for cuts. Detroit and Wall Street got theirs. If your representatives lend you a deaf ear, vote the bast@rds out. We're all rowing the same boat. U.S. R&D centers started in garage shops. When access to R&D is gone so will access to the freedoms we take for granted.


Stop pointing fingers at Americans trying their best to contract work here. We could RFQ this part to China in a mouse click but that will only happen when Tim grows up. Never. And sadly a growing majority of buyers are opting for Tim's counterpart on Mainland China. Reverse the trend or flip burgers. Easy choice.

Is your name SQUALE?!!!lol. You have a total of 4 posts on this site and already you are going to take us to school...You're killing me here.

Sadly, Ed - I mean Squale, you haven't provided anything we asked for so I won't even begin to reply to your drivel.
__________________
Tim
Reply With Quote

  #12   Ban this user!
Old 12-19-2011, 03:17 PM
 
Join Date: Dec 2011
Location: usa
Posts: 7
howdyall is on a distinguished road

Hold the burger on that Tim, but I'll take fries with that coke.





Originally Posted by WallyL7 View Post
Is your name SQUALE?!!!lol. You have a total of 4 posts on this site and already you are going to take us to school...You're killing me here.

Sadly, Ed - I mean Squale, you haven't provided anything we asked for so I won't even begin to reply to your drivel.
Reply With Quote

Reply




Currently Active Users Viewing This Thread: 1 (0 members and 1 guests)
 
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
cnc woodern car buck quotes please allkarma Employment Opportunity 1 05-24-2011 06:00 PM
Quotes Wanted _WALLACE_ Australia RFQ's 2 04-11-2011 06:26 AM
Interior Wall Quotes Luke Lockridge Printing, Scanners, Vinyl cutting and Plotters 1 03-02-2009 09:53 AM
Compare models and Quotes pbars319 Want To Buy...Need help! 1 04-22-2008 10:08 PM
Need Laser Cutting Quotes skmetal7 Employment Opportunity 0 11-27-2007 05:21 PM




All times are GMT -5. The time now is 10:24 PM.





Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2012, vBulletin Solutions, Inc.
Content Relevant URLs by vBSEO
Template-Modifications by TMS

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136 137 138 139 140 141 142 143 144 145 146 147 148 149 150 151 152 153 154 155 156 157 158 159 160 161 162 163 164 165 166 167 168 169 170 171 172 173 174 175 176 177 178 179 180 181 182 183 184 185 186 187 188 189 190 191 192 193 194 195 196 197 198 199 200 201 202 203 204 205 206 207 208 209 210 211 212 213 214 215 216 217 218 219 220 221 222 223 224 225 226 227 228 229 230 231 232 233 234 235 236 237 238 239 240 241 242 243 244 245 246 247 248 249 250 251 252 253 254 255 256 257 258 259 260 261 262 263 264 265 266 267 268 269 270 271 272 273 274 275 276 277 278 279 280 281 282 283 284 285 286 287 288 289 290 291 292 293 294 295 296 297 298 299 300 301 302 303 304 305 306 307 308 309 310 311 312 313 314 315 316 317 318 319 320 321 322 323 324 325 326 327 328 329 330 331 332 333 334 335 336 337 338 339 340 341 342 343 344 345 346 347 348 349 350 351 352 353 354 355 356 357 358 359 360 361