I have a customer wanting to retrofit a Beam Line. It has three spindles, each with two servo axes for drill position. Also has a single servo for indexing the beam into position. All controls need replaced. Given the cost of new CNC type controls like Fanuc and Siemens, can anyone give me a yay or nay as to whether Mach4 is a viable CNC alternative. Thanks.

Similar Threads: