Results 1 to 3 of 3

Thread: G320/G340 'Required Direction Setup' and 'Required Direction Hold' times?

  1. #1
    Registered
    Join Date
    Dec 2003
    Location
    Massachusetts
    Posts
    128
    Downloads
    0
    Uploads
    0

    G320/G340 'Required Direction Setup' and 'Required Direction Hold' times?

    I don't see them listed in the G320 spec. I'm trying to fill in the blanks for the EMC2 step timing calculator spreadsheet.


  2. #2
    Gold Member
    Join Date
    Mar 2003
    Location
    United States
    Posts
    2,783
    Downloads
    0
    Uploads
    0
    1uS setup and 1uS hold should be just fine. The STP input goes to a D-flop CLK while DIR goes to the D-flop D input. The 1uS time is more than plenty for optoisolator channel delay mismatch (typically +/-200nS).

    Mariss


  3. #3
    Registered
    Join Date
    Dec 2003
    Location
    Massachusetts
    Posts
    128
    Downloads
    0
    Uploads
    0
    thanks for the quick reply


Similar Threads

  1. A Axis and Step and Direction Spindle Setup
    By mklb in forum Mach Software (ArtSoft software)
    Replies: 6
    Last Post: 11-27-2009, 08:19 AM

Posting Permissions


 


About CNCzone.com

    We are the largest and most active discussion forum from DIY CNC Machines to the Cad/Cam software to run them. The site is 100% free to join and use, so join today!

Follow us on

Facebook Dribbble RSS Feed


Search Engine Friendly URLs by vBSEO ©2011, Crawlability, Inc.