![]() | |
| Home Page | Mark Forums Read | Today's Posts | My Replies | Classifieds | Reviews | Photo Gallery | Web Links | Share Files | Advertise With Us | Ad List |
| |||||||
| G-Code Programing Discuss G-code programing and problems here! |
| This forum is sponsored by: |
![]() |
| | LinkBack | Thread Tools | Search this Thread | Display Modes |
|
#2
| ||||
| ||||
| I know on the Fanuc OM controls I use at work use K value in stead. K= loop repeat, non-modal G81 G91 X1. R.05 Z-.073 K5 F4.5 This line of code will drill five holes 1.00 postive on X from previous hole, G91 incremental. G81 G90 X1. Y-1. R.05 Z-.073 K0 F5. This line of code will drill no hole on this line but will on the next. However, it will still move the table to X1. Y-1. The machine will pause and move to next hole and start drilling again. Works great on Tap cycle if you do not want to retap a hole when restarting. Good Luck |
![]() |
| Currently Active Users Viewing This Thread: 1 (0 members and 1 guests) | |
| Thread Tools | Search this Thread |
| Display Modes | |
| |
Similar Threads | ||||
| Thread | Thread Starter | Forum | Replies | Last Post |
| Need Help!- Peck Drill Cycle G83 | Sam A | G-Code Programing | 10 | 02-19-2012 04:14 AM |
| CL2000 drill cycle | cutshaw | Mori lathes | 1 | 02-25-2009 11:48 AM |
| C Axis Drill Cycle | gtrrpa | Parametric Programing | 3 | 06-15-2008 02:12 PM |
| Newbie- Drill cycle for FANUC | slowhandd | Commercial CNC Wood Routers | 0 | 02-25-2008 10:02 PM |
| canned drill cycle | nitrosnfr | General Metalwork Discussion | 2 | 05-24-2006 10:50 AM |