![]() | |
| Home Page | Mark Forums Read | Today's Posts | My Replies | Classifieds | Reviews | Photo Gallery | Web Links | Share Files | Advertise With Us | Ad List |
| |||||||
| G-Code Programing Discuss G-code programing and problems here! |
| This forum is sponsored by: |
![]() |
| | LinkBack | Thread Tools | Search this Thread | Display Modes |
|
#1
| |||
| |||
Can you use a G54 command in the same line as a canned cycle? Example: G43Z1.H1M8 G55 G82 G98 X2.536Y.155 Z-1.3 R-.95 P50 F10. G56 G82 G98 X2.536Y.155 Z-1.3 R-.95 P50 F10. Will this format work to drill the same hole in 2 work coordinate systems? This is on a Fanuc 0M controller. I'm at a new position and the existing programs seem to waste a lot of memory and space with extra lines of code |
|
#2
| ||||
| ||||
| You can always go and try it (without tools or work in place). The control will likely alarm if it does not accept it. Otherwise, just call the work coordinate system on a solitary line before each G82.
__________________ First you get good, then you get fast. Then grouchiness sets in. (Note: The opinions expressed in this post are my own and are not necessarily those of CNCzone and its management) |
![]() |
| Currently Active Users Viewing This Thread: 1 (0 members and 1 guests) | |
| Thread Tools | Search this Thread |
| Display Modes | |
| |
Similar Threads | ||||
| Thread | Thread Starter | Forum | Replies | Last Post |
| Help teach G-code for rookie | HighOctane | G-Code Programing | 16 | 03-16-2006 10:18 AM |
| Macro Work Coordinate | firedog | G-Code Programing | 7 | 06-17-2005 01:03 PM |
| Haas G85 Boring Cycle (canned) | DEAN | Haas Mills | 7 | 12-08-2003 11:12 AM |
| Tool tables | Nimrod | Mastercam | 4 | 11-24-2003 03:31 PM |
| Post configuring (black art?) | John F | OneCNC | 12 | 07-18-2003 02:26 PM |