![]() | |
| Home Page | Mark Forums Read | Today's Posts | My Replies | Classifieds | Reviews | Photo Gallery | Web Links | Share Files | Advertise With Us | Ad List |
| |||||||
| G-Code Programing Discuss G-code programing and problems here! |
| This forum is sponsored by: |
![]() |
| | LinkBack | Thread Tools | Search this Thread | Display Modes |
|
#1
| ||||
| ||||
| I normally use center cutting mills, and have had no need for ramping into the material. Can some one add to these to show me what the ramping code would look like? G00 Z0.05 X-1.952 Y2.7149 G01 Z-0.0625 F3. X-2.1465 Y2.6441 F18. X-4.9368 Y1.6285 X-5.1313 Y1.5577 G00 Z0.05 Doesn't it just do a Z movement with the feed as it does while contouring? Like this?; G00 Z0.05 X-1.952 Y2.7149 G01 X-2.1465 Y2.6441 Z-0.0625 F18. X-4.9368 Y1.6285 X-5.1313 Y1.5577 Z0.0 G00 Z0.05 Thanks for your time, Kenny
__________________ "Plan your work; Work your plan" |
|
#2
| ||||
| ||||
| Kenny, It is almost as you describe it. However, you will notice that in your sample, that you will not have a full depth cut from X-1.952 Y2.7149 to X-4.9368 Y1.6285 This is because of the Z value being added during the first feed movement. In some circumstances such as roughing, this may be acceptable. At other times, you may want to add an intermediate XY position to ramp down to in Z, so that the rest of your code works as planned. If the ramp is a shallow angle but to a significant depth, and yet must work in a confined space, then you may need a spiral ramp, which would be a whole series of XYZ movements interpolated from a helical spiral. If you have a cadcam system, this would be easier to accomplish.
__________________ First you get good, then you get fast. Then grouchiness sets in. (Note: The opinions expressed in this post are my own and are not necessarily those of CNCzone and its management) |
|
#3
| ||||
| ||||
| Yes, Kenny, that's all you need. But even with center cutting EM's you can engage more material faster with less tool porblems by ramping instead of plunging. 'Rekd
__________________ Matt San Diego, Ca ___ o o o_ [l_,[_____], l---L - □lllllll□- ( )_) ( )_)--)_) (Note: The opinions expressed in this post are my own and are not necessarily those of CNCzone and its management) |
|
#4
| ||||
| ||||
| Hu, This cut is a cosmetic groove 1/16 deep, so the vertical arc being created on entry is what is wanted for this application. Rekd, I did not realize that ramping was a time saver as well as helping tool life. Now that I think about it, it does make perfect sense. What was I thinking?! Thanks for the help and knowledge, Kenny
__________________ "Plan your work; Work your plan" |
|
#5
| ||||
| ||||
| Kenny, you're entirely welcome. You'll prolly want to be fairly conservative on the speeds/feeds and angle of ramp at first, until you get used to it. You'll be able to go pretty fast, but it's a bit different than normal milling. I used to drill pilot holes, but finally realized it was even faster than that. 'Rekd
__________________ Matt San Diego, Ca ___ o o o_ [l_,[_____], l---L - □lllllll□- ( )_) ( )_)--)_) (Note: The opinions expressed in this post are my own and are not necessarily those of CNCzone and its management) |
| Sponsored Links |
![]() |
| Currently Active Users Viewing This Thread: 1 (0 members and 1 guests) | |
| Thread Tools | Search this Thread |
| Display Modes | |
| |
Similar Threads | ||||
| Thread | Thread Starter | Forum | Replies | Last Post |
| Need Advice For Ramping Angle | lerman | General Metalwork Discussion | 0 | 03-27-2005 01:49 PM |
| Ramping | pauls | BobCad-Cam | 1 | 03-04-2005 04:49 PM |
| BobCAD; steps on ramping? | inthedark | BobCad-Cam | 18 | 04-07-2004 09:48 AM |