![]() | |
| Home Page | Mark Forums Read | Today's Posts | My Replies | Classifieds | Reviews | Photo Gallery | Web Links | Share Files | Advertise With Us | Ad List |
| |||||||
| Fanuc Discuss Fanuc controllers here! |
| This forum is sponsored by: |
![]() |
| | LinkBack | Thread Tools | Search this Thread | Display Modes |
|
#5
| |||
| |||
| The 0-TB Operators Manual specified a 7 digit P-word and states that a call command can specify up to 999 repetitions of a subprogram. The 0-TC Operators Manual specifies an 8 digit P-word and states that a call command can specify up to 9999 repetitions of a subprogram. |
| Sponsored Links |
|
#6
| ||||
| ||||
|
|
#7
| |||
| |||
| Your original reply was fine in that it presented the correct solution methodology. These forums are useful in not only solving the particular problem reported by the original poster, but also inform and educate others with various FANUC CNC models. Since FANUC's controls do vary somewhat in capabilities, if he encountered an error when running an 8 digit P-word on the 0-TB, he could go to that appropriate CNC manual and figure out the error. btw: I had no idea of this slight operational difference in the 0-TB vs 0-TC until after I checked on the question in sinha_nsit's post. |
|
#8
| |||
| |||
| The best thing is to check on the machine. Manuals sometimes give contradictory information. For example, on page 129 of 0i-TC Operator's Manual, maximun repetition count is stated as 9999, but in the given syntax, only three spaces are shown for repetition count (followed by four spaces for subprogram number). And, IIRC, OiMate-TC ignores the eighth digit from right. But 9999 repetitions are still possible with L9999. |
![]() |
| Currently Active Users Viewing This Thread: 1 (0 members and 1 guests) | |
| Thread Tools | Search this Thread |
| Display Modes | |
| |
Similar Threads | ||||
| Thread | Thread Starter | Forum | Replies | Last Post |
| Rhinocam and multiple spindles and or multiple tables? | brett gallmeyer | Rhinocam | 0 | 02-23-2011 01:30 PM |
| Newbie- Can I call a subprogram from within a canned cycle? | TXFred | G-Code Programing | 5 | 12-09-2010 04:59 PM |
| subprogram | krow | OKK | 0 | 09-30-2009 05:18 PM |
| Need Help!- OKUMA Mill Poste Edit for " NCYL " subprogram call | QAZEWQ | Mastercam | 7 | 06-14-2009 08:56 AM |
| eia subprogram | rs1982 | Mazak, Mitsubishi, Mazatrol | 4 | 04-11-2008 08:10 AM |