CNCzone.com-The Largest Machinist Community on the net!



Home Page Mark Forums Read Today's Posts My Replies Classifieds Reviews Photo Gallery Web Links Share Files Advertise With Us Ad List
Go Back   CNCzone.com-The Largest Machinist Community on the net! > Employment Opportunity and RFQ (Request for Quote). > Employment Opportunity


Employment Opportunity Looking for a job in the machining field, need a employee in the CNC field post it here!


This forum is sponsored by:

Reply
 
LinkBack Thread Tools Search this Thread Display Modes
  #1   Ban this user!
Old 12-31-2010, 11:31 AM
 
Join Date: Dec 2010
Location: USA
Posts: 6
KW52 is on a distinguished road
Quote & ideas

I market these patent pending motorcycle license frames. Appx. 4" X 7", curently they are CNC milled flat and then rolled to get the curve needed, all the dimensions are very specific as their is a lighting system installed and the curve fits a specific fender. I know little of machining but would like to get these milled with the curve.In other words skip the rolling process.They are made of 5052 aluminum. Any rough quotes for qty of 10 or 20 at a time or DIY ideas to get these produced would be appreciated.Living in a small city so options here are limited . I can send samples to serious prospects.
Attached Thumbnails
Click image for larger version

Name:	CNC.com.JPG‎
Views:	108
Size:	164.7 KB
ID:	122564  

Last edited by KW52; 12-31-2010 at 11:51 AM.
Reply With Quote

  #2   Ban this user!
Old 12-31-2010, 08:37 PM
 
Join Date: Jan 2008
Location: Riverside Ca. USA
Posts: 350
Dualkit is on a distinguished road

The rolling saves a lot of material cost and machining time. It would be helpful to list a target price so no one wastes time working up a quote at a price that is too prohibitive to make these profitable. This looks like a no go from a cost point of view. Fixturing costs will be way too high to amortize over 20 parts and make the part where it can be resold at a profit.
Reply With Quote

  #3   Ban this user!
Old 01-01-2011, 09:58 AM
 
Join Date: Dec 2010
Location: USA
Posts: 6
KW52 is on a distinguished road

Originally Posted by Dualkit View Post
The rolling saves a lot of material cost and machining time. It would be helpful to list a target price so no one wastes time working up a quote at a price that is too prohibitive to make these profitable. This looks like a no go from a cost point of view. Fixturing costs will be way too high to amortize over 20 parts and make the part where it can be resold at a profit.
The problem with rolling is distortion.The long edges bow outward.I massage them back down with a mallet.The corners get small dents in them,more massaging and the ends have that smashed look and the material rolls over onto the short edges,xtra sanding.In the end they look good.The idea is to try and cut down pre polishing prep.These go on custom motorcycles so they have to be perfect. Would pressing them into a slightly oversized fixture made with the curveature work ? Could they be made for less than $40.00 ea. if the above process was a possibility ?
Reply With Quote

  #4   Ban this user!
Old 01-01-2011, 12:37 PM
 
Join Date: Apr 2004
Location: BC, Canada
Posts: 40
a1cadcam is on a distinguished road

what is the height of the curve when both ends are laying flat?

you do the math... what would the material cost... most likely 6061-t6?
more than $40 im guessing...

could maybe try bending the material before machining.... or casting it then machining... but it does seem like you have found the cheapest way of doing it.

add up the extra time you spend tapping it all into place($80/hr or so) and add it to the cost of the flat holder before bending... plus the extra material... will give you an idea of cost.

your holder is 'trick'.

Phil
Reply With Quote

  #5   Ban this user!
Old 01-01-2011, 01:13 PM
 
Join Date: Dec 2010
Location: USA
Posts: 6
KW52 is on a distinguished road

Originally Posted by a1cadcam View Post
what is the height of the curve when both ends are laying flat?

you do the math... what would the material cost... most likely 6061-t6?
more than $40 im guessing...

could maybe try bending the material before machining.... or casting it then machining... but it does seem like you have found the cheapest way of doing it.

add up the extra time you spend tapping it all into place($80/hr or so) and add it to the cost of the flat holder before bending... plus the extra material... will give you an idea of cost.

your holder is 'trick'.

Phil
The aluminum is billet 5052,getting them less than $40.00 now
including material CNC and rolling.Never thought of rolling the material first.
what type of machine would it take to do the CNC after rolling?
Reply With Quote

Sponsored Links
  #6   Ban this user!
Old 01-01-2011, 06:12 PM
 
Join Date: Apr 2004
Location: BC, Canada
Posts: 40
a1cadcam is on a distinguished road

really, with the proper fixtures and programming...
a 3-axis mill should be sufficient... 4th axis would be easier...
but here is where the experience and technique add a significant value...
and you are asking this question?... not sure what your final goal here is...

talk to your local machine shop who is doing it now... about different ways and what they feel comfortable with...

what i/we think might be beyond their scope and comfort zone... maybe they will have some suggestions which would suite them better to help you out.

another possibility... cut it out of pipe/tubing... depending on the radius required.

i am done here, must be the Christmas spirit... there are many ways to get it done, you just have to pick the way which bests suites you and your capabilities...

if you wish to send me the part for a quote, please email me at phil @ tddinc . com (no spaces)

hope this has helped you...

Phil
Reply With Quote

  #7   Ban this user!
Old 01-01-2011, 06:59 PM
 
Join Date: Sep 2009
Location: U.S.A. #1
Posts: 309
universalfab is on a distinguished road

The ideas are there and a few that I "somewhat" gave you in a PM that I'm not going to disclose. Your aim is to reduce or eliminate time spent on straightening the distortions and lower polishing times. What it boils down to is what is your time worth? I value mine and that will reflect in my pricing as it should anyone elses. You figure you put 2-3 hours at least into straightening and polishing your part, whats that worth to you not to have to do it?
3-d machining it out of a solid chunk of aluminum to that shape is going to be expensive to machine and the material is going to be expensive. I gave you a extremely reasonable offer that would save you alot of time and give you quallity parts.
Reply With Quote

  #8   Ban this user!
Old 01-01-2011, 09:48 PM
 
Join Date: Jan 2008
Location: Riverside Ca. USA
Posts: 350
Dualkit is on a distinguished road

Unfortunately the volume here is what makes a nice distortion free product a no go from a manufacturing stand point. This part could be machined flat and probably pressed between two dies to attain the curvature. The cost of the dies would probably run $1,000-$2,000 a set plus a designing \ engineering fee. Hydro forming instead of pressing \ stamping would probably yield a nicer product yet.
At 20 pieces you can't afford the tooling costs, so rolling is what you are stuck with. If you could sell 10's of thousands of these so you could afford a $10,000 tooling \ set-up charge you could end up paying less than $10 plus material each for these parts. We all appreciate you giving a price target, so no one wastes time with involved quoting that won't yield a price you can work with. Every time you see someone selling something at a low price,
it's all about the volume.
Reply With Quote

  #9   Ban this user!
Old 01-03-2011, 08:32 PM
 
Join Date: Dec 2010
Location: USA
Posts: 6
KW52 is on a distinguished road

All valid points.Most of which I knew would'nt be cheap.Wish I was selling tens of thousands,(not Yet ) totally get the volume picture.Just trying to improve my product a little at a time with fresh ideas and input without breaking the bank,not gonna go out to far on a limb all at once and don't expect anyone else to either.Appreciate the time you guys have given me and the PM's. all of which are being considered.
Reply With Quote

Reply




Currently Active Users Viewing This Thread: 1 (0 members and 1 guests)
 
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Need a quote zonker Employment Opportunity 0 08-22-2010 08:00 PM
Need A Quote- Need a job quote les99 Australia, New Zealand Club house 0 05-16-2010 06:07 AM
mfg quote MBG General Metalwork Discussion 15 07-30-2009 03:36 PM
Quote and Multi-Quote JoBwan Test Forum 0 02-23-2008 05:58 AM
Quote please elmor fudd Employment Opportunity 2 03-21-2006 04:58 AM




All times are GMT -5. The time now is 12:34 PM.





Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2012, vBulletin Solutions, Inc.
Content Relevant URLs by vBSEO
Template-Modifications by TMS

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136 137 138 139 140 141 142 143 144 145 146 147 148 149 150 151 152 153 154 155 156 157 158 159 160 161 162 163 164 165 166 167 168 169 170 171 172 173 174 175 176 177 178 179 180 181 182 183 184 185 186 187 188 189 190 191 192 193 194 195 196 197 198 199 200 201 202 203 204 205 206 207 208 209 210 211 212 213 214 215 216 217 218 219 220 221 222 223 224 225 226 227 228 229 230 231 232 233 234 235 236 237 238 239 240 241 242 243 244 245 246 247 248 249 250 251 252 253 254 255 256 257 258 259 260 261 262 263 264 265 266 267 268 269 270 271 272 273 274 275 276 277 278 279 280 281 282 283 284 285 286 287 288 289 290 291 292 293 294 295 296 297 298 299 300 301 302 303 304 305 306 307 308 309 310 311 312 313 314 315 316 317 318 319 320 321 322 323 324 325 326 327 328 329 330 331 332 333 334 335 336 337 338 339 340 341 342 343 344 345 346 347 348 349 350 351 352 353 354 355 356 357 358 359 360 361