Page 2 of 2 FirstFirst 12
Results 13 to 14 of 14

Thread: CNC-routerbuild-advise

  1. #13
    Registered
    Join Date
    Apr 2012
    Location
    Sweden
    Posts
    11
    Downloads
    0
    Uploads
    0
    Another quastion: Is it better to try and put the linear guidlines on the top/bottom vs front like it is now on my design?


  2. #14
    Registered
    Join Date
    Apr 2012
    Location
    Sweden
    Posts
    11
    Downloads
    0
    Uploads
    0
    Made some adjustments and made some simple calculations for the forces that the guidelines... Shouldn't be any problem as they can stand up to 11kN a piece.
    Attached Thumbnails Attached Thumbnails CNC-routerbuild-advise-bild_1.jpg  


Page 2 of 2 FirstFirst 12

Similar Threads

  1. Need advise
    By Scuba Steve in forum General Metal Working Machines
    Replies: 2
    Last Post: 12-03-2011, 09:00 PM
  2. a little advise
    By DistortedDesign in forum Joes CNC Model 2006
    Replies: 4
    Last Post: 05-29-2010, 03:10 PM
  3. looking for advise
    By phill05 in forum General CNC (Mill and Lathe) Control Software (NC)
    Replies: 0
    Last Post: 03-09-2010, 03:19 AM
  4. need some advise
    By joey1117 in forum Benchtop Machines
    Replies: 0
    Last Post: 09-01-2007, 10:47 PM
  5. Will this get me going? Please advise...
    By Witsenburg in forum Stepper Motors and Drives
    Replies: 1
    Last Post: 04-13-2007, 11:50 AM

Posting Permissions


 


About CNCzone.com

    We are the largest and most active discussion forum from DIY CNC Machines to the Cad/Cam software to run them. The site is 100% free to join and use, so join today!

Follow us on

Facebook Dribbble RSS Feed


Search Engine Friendly URLs by vBSEO ©2011, Crawlability, Inc.