Newbie Moving Knot


Results 1 to 4 of 4

Thread: Moving Knot

  1. #1
    Registered
    Join Date
    May 2009
    Location
    United States
    Posts
    25
    Downloads
    0
    Uploads
    0

    Default Moving Knot

    I read through the "Make your gantry rock solid!" thread where a "moving knot" design like those cable systems in drafting tables and pocket doors is described. Judging from the responses in that thread and having seen various "high end" fences and such that use a similar design, I'm willing to believe it will work.

    One could obviously use the design to simply reduce the effect of racking, but I'm wonderng has anyone out there used such a design as the primary linear motion system. If you had a ~4" diameter "winch" you could get about 1' of cable for each wrap around the winch. If you use your stepper to directly drive the winch, and the cables are set up in a moving knot configuration, it would seem like you could get all the benefits of a double leadscrew set up without having to deal with screw whip.

    Of course there may be interesting backlash issues and you may need to gear down the stepper to get a decent resolution, and half a dozen other things I haven't thought of, but it should work shouldn't it?

    I'm not asking because I think it is going to be cheap, I'm curious why I haven't seen it discussed before. Or has it been and my search-fu is just weak?

    Similar Threads:


  2. #2
    Registered
    Join Date
    Jul 2009
    Location
    Canada
    Posts
    140
    Downloads
    0
    Uploads
    0

    Default

    Quote Originally Posted by MunchyMonster View Post
    I read through the "Make your gantry rock solid!" thread where a "moving knot" design like those cable systems in drafting tables and pocket doors is described. Judging from the responses in that thread and having seen various "high end" fences and such that use a similar design, I'm willing to believe it will work.

    One could obviously use the design to simply reduce the effect of racking, but I'm wonderng has anyone out there used such a design as the primary linear motion system. If you had a ~4" diameter "winch" you could get about 1' of cable for each wrap around the winch. If you use your stepper to directly drive the winch, and the cables are set up in a moving knot configuration, it would seem like you could get all the benefits of a double leadscrew set up without having to deal with screw whip.

    I'm not asking because I think it is going to be cheap, I'm curious why I haven't seen it discussed before. Or has it been and my search-fu is just weak?
    I see a few shortcomings here...

    1) If the "knot" is where the drive movement is coming from - where the stepper attaches to the system, how would you overcome the need for the stepper to move with the "knot"?

    2) There would quite likely be efficiency issues driving such a beast from the pulley.

    3) I could see this being very hard on pulley bearings, leading to all sorts of precision problems.

    BUT,

    These are not fatal to the concept - there might be something to it!

    --
    ck


  3. #3
    Registered
    Join Date
    May 2009
    Location
    United States
    Posts
    25
    Downloads
    0
    Uploads
    0

    Default

    1) If the "knot" is where the drive movement is coming from - where the stepper attaches to the system, how would you overcome the need for the stepper to move with the "knot"?
    I might not have this visualized correctly But I assumed that the stepper would be mounted to the table. The "drum" of the winch would be mounted to the table as well.

    Since the Moving Knot system uses the movement of one side or the other of the gantry to apply pressure to the other side (to avoid wracking), I'm simply suggesting that one drive the cable directly instead of driving the gantry and using the cable to stop the racking.

    I'll have to draw up a sketch of what I'm proposing, maybe that will make it more clear and allow you to point out the problems in such a way that I'm not misunderstanding what you are saying.



  4. #4
    Registered tpworks's Avatar
    Join Date
    Nov 2003
    Location
    United States
    Posts
    244
    Downloads
    0
    Uploads
    0

    Default Belt driven gantry

    using 2 open ended timing belts fixed to the gantry ends and adjustments will be made there. Same principle as the Paralok fence system that I posted in the other afore mentioned thread.
    Your cable idea could be adapted the same route.
    I believe some of the older cnc engraver machines used a cable system utilizing the drum method, sort of like an overhead door with the torsion type springs.

    Attached Thumbnails Attached Thumbnails Moving Knot-belt-driven-gantry-gif  
    Last edited by tpworks; 11-05-2010 at 11:22 PM.
    ...He who makes no mistakes makes nothing! ...
    Tom


Tags for this Thread

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •  


About CNCzone.com

    We are the largest and most active discussion forum for manufacturing industry. The site is 100% free to join and use, so join today!

Follow us on


Our Brands

Moving Knot

Moving Knot