Results 1 to 5 of 5

Thread: Bar Pull Delays

  1. #1
    Registered
    Join Date
    May 2006
    Location
    USA
    Posts
    54
    Downloads
    0
    Uploads
    0

    Bar Pull Delays

    Hello,
    I have a PUMA 8HC-3A that I am using a bar puller on. My issue is that when the program executes the Chuck open command it takes from 5 to 7 seconds before the machine will continue and then the same thing hapens on the Chuck close. this adds at least 15 seconds to a part that should only take 30 seconds. Its a pretty steep price to pay! Does anyone know of Parameters or settings that adjust the delay for these two functions.

    The control is a FANUC 15T.

    Thanks in advance.


  2. #2
    Registered MysticMonkey's Avatar
    Join Date
    Mar 2009
    Location
    Australia
    Posts
    367
    Downloads
    0
    Uploads
    0
    Hi is this delay after the proxy comes on?

    Is your CNC a OT-C?

    I looked through a ladder I see

    TMR - 2 - D0315 (Time Delay For Chuck (5 Sec))
    &
    TMR - 3 - D0320 (Time Delay For Chuck (3 Sec))

    I do not have an 'L' PMC manual so I can't check but I expect the D indicates it is one of the Diagnostic values you need to change. ??
    Last edited by MysticMonkey; 02-03-2010 at 03:08 AM.
    ***********************************************************
    *~~Darwinian Man, though well-behaved, At best is only a monkey shaved!~~*
    ***********************************************************
    *__________If you feel inclined to pay for the support you receive__________*
    *_______Please give to charity http://www.oxfam.org/en/getinvolved_______*
    ***********************************************************


  3. #3
    Registered
    Join Date
    May 2006
    Location
    USA
    Posts
    54
    Downloads
    0
    Uploads
    0
    Thanks for the reply.
    Sounds like there may be an answer out there for me.
    The delay is after the chuck is open and the proximity switch has activated. Also after the chuck has closed.
    I do not know what you mean by "Is your CNC an OT-C?"
    I have no "PMC Manual" so I have no idea how or where do go looking for/chaging the values.


  4. #4
    Registered
    Join Date
    May 2006
    Location
    USA
    Posts
    54
    Downloads
    0
    Uploads
    0
    Mystic Monkey,

    You are right, with a little help, I located the timers and found that both were set at 4.9seconds, I have since reset them to 1 second and am very pleased with the results.


  • #5
    Registered
    Join Date
    May 2007
    Location
    USA
    Posts
    939
    Downloads
    0
    Uploads
    0
    Quote Originally Posted by bmlw View Post
    I do not know what you mean by "Is your CNC an OT-C?".
    OT-C is an older model Fanuc control.


  • Similar Threads

    1. Need Help!- Bar Pull on Fanuc 15T
      By bmlw in forum Fanuc
      Replies: 12
      Last Post: 02-02-2010, 12:29 AM
    2. Need Help!- need a bar pull program!!
      By the mill kid in forum Mazak, Mitsubishi, Mazatrol
      Replies: 1
      Last Post: 08-13-2009, 06:22 PM
    3. pull studs
      By najnielkp in forum General Metal Working Machines
      Replies: 8
      Last Post: 06-11-2009, 09:42 PM
    4. Need Help!- BAR PULL?
      By travis1 in forum Haas Lathes
      Replies: 10
      Last Post: 02-11-2009, 03:22 PM
    5. delays in delivery from milltronics?
      By panaceabea in forum Milltronics
      Replies: 26
      Last Post: 12-02-2007, 01:12 PM

    Posting Permissions


     


    About CNCzone.com

      We are the largest and most active discussion forum from DIY CNC Machines to the Cad/Cam software to run them. The site is 100% free to join and use, so join today!

    Follow us on

    Facebook Dribbble RSS Feed


    Search Engine Friendly URLs by vBSEO ©2011, Crawlability, Inc.