CNCzone.com-The Largest Machinist Community on the net!



Home Page Mark Forums Read Today's Posts My Replies Classifieds Reviews Photo Gallery Web Links Share Files Advertise With Us Ad List
Go Back   CNCzone.com-The Largest Machinist Community on the net! > MetalWorking Machines > Daewoo/Doosan


Daewoo/Doosan Discuss Daewoo/Doosan machines here!


This forum is sponsored by:

Reply
 
LinkBack Thread Tools Search this Thread Display Modes
  #1   Ban this user!
Old 02-06-2008, 08:37 AM
 
Join Date: Feb 2008
Location: USA
Posts: 1
Ken Czys is on a distinguished road
Exclamation I'm considering purchasing Daewoo - Doosan

We are considering purchasing our first Daewoo Puma Gantry Lathe. Does anyone have any positive or negative experience with their machines?
Reply With Quote

  #2   Ban this user!
Old 02-07-2008, 05:47 AM
 
Join Date: Sep 2007
Location: Australia
Posts: 47
ragman is on a distinguished road

Earlier machines (pre1995) were a bit problematic. The later ones are much better. They sometimes have little problems here and there (we've had trouble with hyd pressure switches, coolant pumps and sometimes tool measurers sticking. Overall they are a good buy. They seem to be built stronger than some of the Japanese machines. Of course you can still get a bad one like with anything. Would be hard to go past one (for a middle range machine) in my opinion. There are better and there are worse around.
Reply With Quote

  #3   Ban this user!
Old 02-07-2008, 05:59 AM
 
Join Date: Feb 2008
Location: England
Posts: 2
WeirDave is on a distinguished road

Hi, we have 2 Puma 230 MSB's, a Puma 2000SY and an ACE V430 VMC. All very good machines in my opinion!
Reply With Quote

  #4   Ban this user!
Old 02-07-2008, 11:55 AM
phx phx is offline
 
Join Date: Jan 2004
Location: Germany
Posts: 79
phx is on a distinguished road

Originally Posted by Ken Czys View Post
We are considering purchasing our first Daewoo Puma Gantry Lathe. Does anyone have any positive or negative experience with their machines?
Hi Ken

i have a Puma 2500y, since a half year, works fine,
if u can live with the Fanuc Control, and the direktTooling turret(non VDI)
it schould be a good deal.

greets
Reply With Quote

  #5   Ban this user!
Old 02-07-2008, 02:13 PM
CNCRim's Avatar  
Join Date: Feb 2006
Location: usa
Posts: 947
CNCRim is on a distinguished road

They are the great bang for the buck machine, go for it.
__________________
The best way to learn is trial error.
Reply With Quote

Sponsored Links
  #6   Ban this user!
Old 02-07-2008, 06:17 PM
 
Join Date: Aug 2005
Location: US
Posts: 27
daewooevc is on a distinguished road

What part of the country are you in?
Reply With Quote

  #7   Ban this user!
Old 02-09-2008, 09:31 AM
 
Join Date: Sep 2006
Location: USA
Posts: 57
STS_John is on a distinguished road
Daewoo / Doosan Experience

We have 3 Daewoo / Doosan mill-turn centers. 2500LSY, 2500SY, and 2000SY

My sentiments are very close to the comments above.

Good bang for the buck, compared to Mori Sieki or Nokamura Tomi. The lathes seem to be very strong mechanically, and we are happy with the Fanuc controller.

Negative Side: Our experience (our machines are 1 year to 3 years old) is Daewoo really skimped on quality in peripheral devices. Hyd and proximity switches have been a nightmare. We had one proximity switch on parts catcher go bad 3 times in one month. $150.00 each time for a new switch, not to mention loss of production. I understand Doosan is addressing this problem, and lately switches we have replaced have been upgraded. All three lathes have had either coolant pumps or skimmer units replaced, mostly on warranty.

I am out of warranty now, and I am not looking forward to the bills from the less than quality components failing on a regular basis this year.

If I were to buy another similar lathe (and I would buy Doosan again), I would negotiate an extended warranty on coolant pumps, skimmer units, and switches (both hydraulic and proximity). I might even demand extra switches be suppled to keep at the shop. We have become quite proficient in replacing the switches, they have failed that often on all 3 machines. Having the replacement switches in house could reduce downtime when a failure occurs, they are not difficult to replace

In my opinion the units are good investments, I hope Doosan is considering upgrading the areas which cause the problems above. I would gladly pay an extra $5K more for the machine to have better quality components. If the switches, pumps, and skimmers were better quality, then I believe the Doosan mill-turn centers would possibly be the best investment in the market.
Reply With Quote

Reply




Currently Active Users Viewing This Thread: 1 (0 members and 1 guests)
 
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Doosan LSY2500 tapping with subspindle DocHod Daewoo/Doosan 6 12-21-2007 12:11 PM
Doosan 1500 TT 9566317 Daewoo/Doosan 1 10-17-2007 08:25 PM
Doosan 3016L SIG Daewoo/Doosan 6 10-13-2007 12:24 AM
CNC VTL, Doosan, Amera Seiki, or You Ji? rsbeadle General Metal Working Machines 1 10-11-2007 01:10 PM
which machine Haas vf 2 or doosan mynx nm 410 ? aussie28 Haas Mills 11 09-19-2007 04:19 AM




All times are GMT -5. The time now is 10:20 AM.





Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2012, vBulletin Solutions, Inc.
Content Relevant URLs by vBSEO
Template-Modifications by TMS

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136 137 138 139 140 141 142 143 144 145 146 147 148 149 150 151 152 153 154 155 156 157 158 159 160 161 162 163 164 165 166 167 168 169 170 171 172 173 174 175 176 177 178 179 180 181 182 183 184 185 186 187 188 189 190 191 192 193 194 195 196 197 198 199 200 201 202 203 204 205 206 207 208 209 210 211 212 213 214 215 216 217 218 219 220 221 222 223 224 225 226 227 228 229 230 231 232 233 234 235 236 237 238 239 240 241 242 243 244 245 246 247 248 249 250 251 252 253 254 255 256 257 258 259 260 261 262 263 264 265 266 267 268 269 270 271 272 273 274 275 276 277 278 279 280 281 282 283 284 285 286 287 288 289 290 291 292 293 294 295 296 297 298 299 300 301 302 303 304 305 306 307 308 309 310 311 312 313 314 315 316 317 318 319 320 321 322 323 324 325 326 327 328 329 330 331 332 333 334 335 336 337 338 339 340 341 342 343 344 345 346 347 348 349 350 351 352 353 354 355 356 357 358 359 360 361