most of these use a spoil board(mdf) or some other porous material between the vacuum table and the work. the vacuum can hold the work in place by sucking through this material. If it is nessesary the operator will level this board by running over its entire surface with a large diameter router bit (flycutter). This will at least make the gantry and the bed parallel.


LinkBack URL
About LinkBacks




