Results 1 to 1 of 1

Thread: Looing for another machine for short run production.

  1. #1
    Registered
    Join Date
    Aug 2008
    Location
    USA
    Posts
    1
    Downloads
    0
    Uploads
    0

    Looing for another machine for short run production.

    We have a Haas Vf2 for our die making and the short run production is taking time out of producing the dies (only have 1 cnc). We need to purchase another vertical mill for the short run machining production. We don't want to buy a brand new machine and drop 40-80 k on it for piddley stuff. Anyone have any suggestions on a machine or maybe a used machinery company that is reliable? All the work we do is fairly small (under 12" long) so we dont need a large machine.
    Last edited by Mandingo; 08-21-2008 at 11:38 AM.


Similar Threads

  1. Looing for an odd bolt
    By automizer in forum CNCzone Club House
    Replies: 2
    Last Post: 06-29-2008, 01:20 PM
  2. Open machine time: Medium to high production runs- Thank you!
    By mattsam in forum Employment Opportunity
    Replies: 1
    Last Post: 11-27-2006, 09:27 AM
  3. Small part, very short production.
    By pyrojon in forum Employment Opportunity
    Replies: 5
    Last Post: 01-26-2006, 09:34 AM
  4. Plasma-OXY-Marker- Production Dream Machine Recomendatons
    By Ben Hagler in forum General Waterjet
    Replies: 0
    Last Post: 10-09-2005, 09:30 PM
  5. Short CNC machine with wide gantry or...
    By Mr.Ed in forum DIY CNC Router Table Machines
    Replies: 25
    Last Post: 12-10-2003, 01:32 AM

Posting Permissions


 


About CNCzone.com

    We are the largest and most active discussion forum from DIY CNC Machines to the Cad/Cam software to run them. The site is 100% free to join and use, so join today!

Follow us on

Facebook Dribbble RSS Feed


Search Engine Friendly URLs by vBSEO ©2011, Crawlability, Inc.