    Hi there,
    I have a question - I'm not an experienced operator, but landed myself a Bridgeport Series 2 Interact 2 and just finished retrofitting the machine with an AJAX/Centroid Control. Now I get to learn how to use the machine. I need to mill a couple of deep aluminum pockets (3" deep) and have a Sandvik RA390 Long Shoulder Mill. The cutting diameter is the same as the shank dia, and the tool is about 8" long overall. If I run the tool down into the pocket wherein the shank is in the pocket and running along the sides - is that bad? - or should I pick up a tool where the shank has a smaller dia than the cutting dia.

    Thanks

    Jay

    Similar Threads:


  2. #2
    Community Moderator Jim Dawson's Avatar
    Join Date
    Dec 2013
    Posts
    5717
    Downloads
    0
    Uploads
    0

    Default Re: Shoulder Mill Help

    I have done that, but I don't like to. I have relieved the shank on the endmill, just used a bench grinder to do that. Only takes a few thousandths to have enough clearance.



  3. #3
    Member
    Join Date
    May 2005
    Location
    Canada
    Posts
    90
    Downloads
    0
    Uploads
    0

    Default Re: Shoulder Mill Help

    Thanks Jim - sounds like a plan - I'll throw it into a mill and skim off a smidgen.

    Jay



Tags for this Thread

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •  


About CNCzone.com

    We are the largest and most active discussion forum for manufacturing industry. The site is 100% free to join and use, so join today!

Follow us on


Our Brands

Shoulder Mill Help

Shoulder Mill Help