  #1   Ban this user!
Old 03-21-2008, 10:19 AM
DSE DSE is offline
 
Join Date: Mar 2004
Location: Montana
Posts: 6
DSE is on a distinguished road
Varispeed VFD conversion

I have boss 5 CNC with a noisy head (the spindle is ok). Since I have a VFD to control the spindle speed, I'd like to replace the vari-speed with a V-pulley set up. Does anyone of recommendations or lessons learned on doing this? Pictures are always good.

Thanks
Reply With Quote

  #2   Ban this user!
Old 03-21-2008, 10:34 AM
 
Join Date: Jan 2005
Location: USA
Posts: 2,345
mactec54 is on a distinguished road
Buy me a Beer?

Hi DSE

Yes this works great I have done many of these 1to1 & 1-1/2 to1 I have also removed
the low gear on some I will try & do some Photos of my setups I have cut up to
5" out of the top of the machine & it can run it at 6,000 rpms
__________________
Mactec54
Reply With Quote

  #3  
Old 03-21-2008, 12:50 PM
Al_The_Man's Avatar
Community Moderator
 
Join Date: Dec 2003
Location: Canada
Posts: 16,536
Al_The_Man is on a distinguished road
Buy me a Beer?

I replaced the vari-speed on my two Excello's with timing belt/pulleys, They have a gear box with 1:1 & 6:1 speed, which is useful for the low rpm needs, I went 1:1 on the motor to spindle shaft and run the existing 4 pole motor at 120Hz for x2 rpm.
Al.
__________________
CNC, Mechatronics Integration and Machine Design.
“Logic will get you from A to B. Imagination will take you everywhere.”
Albert E.
Reply With Quote

  #4   Ban this user!
Old 03-21-2008, 03:07 PM
 
Join Date: Oct 2006
Location: USA
Posts: 42
Dennis Storzek is on a distinguished road

I just did likewise on an old BOSS 6 that had a clapped out Vari-drive that had eaten the motor shaft. The BOSS machines have a very squat motor with an eight inch long shaft, not one that was going to be cheap and easy to find. Anyway, I wanted to increase the top speed to 5k.

I picked up a 3HP Reliance motor new in box on e-bay for less than new vari-speed disks would have cost. I went 3HP because I'm running a 1:1.5 pulley ratio to increase the spindle speed, so I don't have to drive the motor more than 120hz to get my 5k. If it lacks torque on the low end I can always change to a 1:1 drive (pulley centers will be the same) but then I'll have to drive the motor to 5k also. The new motor was too tall to fit under the belt housing like the original, so it's mounted on top like on a manual 2J head. This way, the stock shaft length wasn't a problem. Works great, but if it had to go in a basement shop I'd be in trouble with mama; I'd have to cut a hole in the first floor and cover it with a drum table. The darned thing is now 8'-8" over the top of the motor and barely fits under the ceiling in the shop at work.

"L" series timing belts are rated 6HP per inch of width; I had room for a 1" wide belt, so used that. A 24 tooth pulley was the smallest that would fit the spindle shaft, so I used a 36 on the motor, and an 80 tooth belt put the motor back in about the same location it was, the aluminum adapter plate has slotted holes for fine tuning. If I want to go to a 1:1 ratio, two 36 tooth pulleys and an 84 tooth belt will put the motor in within .020" of the same place. So far I haven't felt the need, but haven't done much work down around 500 – 600 RPM, so time will tell.

Dennis
Reply With Quote

  #5   Ban this user!
Old 03-21-2008, 05:26 PM
 
Join Date: Jan 2005
Location: USA
Posts: 2,345
mactec54 is on a distinguished road
Buy me a Beer?
Photo

Hi DSE
I do not use the timinig belts as they use more power to drive them
I use a polyVbelt as you can see in the photo all my parts I custom
designed & make it has many changes to the head from the Boss 5 it
was. It has about 4'' out of the top of this Mill
Attached Thumbnails
Click image for larger version

Name:	Mill-2.jpg‎
Views:	234
Size:	59.1 KB
ID:	56055   Click image for larger version

Name:	Mill 030.jpg‎
Views:	216
Size:	50.9 KB
ID:	56056   Click image for larger version

Name:	Mill.jpg‎
Views:	194
Size:	86.1 KB
ID:	56057   Click image for larger version

Name:	Mill 6.jpg‎
Views:	230
Size:	78.8 KB
ID:	56058  

__________________
Mactec54
Reply With Quote

Sponsored Links
  #6   Ban this user!
Old 03-21-2008, 10:26 PM
DSE DSE is offline
 
Join Date: Mar 2004
Location: Montana
Posts: 6
DSE is on a distinguished road

I was thinking of using pulleys like this except with v-belt like mactec54.

mactec54,
Very impressive work. I guess that must be an electrically operated brake?
Attached Thumbnails
Click image for larger version

Name:	IHBeltDrive.jpg‎
Views:	136
Size:	200.9 KB
ID:	56075  
Reply With Quote

  #7   Ban this user!
Old 03-21-2008, 11:57 PM
 
Join Date: Sep 2007
Location: USA
Posts: 113
jacampb2 is on a distinguished road

Originally Posted by mactec54 View Post
Hi DSE
I do not use the timinig belts as they use more power to drive them
I use a polyVbelt as you can see in the photo all my parts I custom
designed & make it has many changes to the head from the Boss 5 it
was. It has about 4'' out of the top of this Mill
That is sweet, and just at the right time. I am converting my b'port series 1 cnc boss4 to vfd and mach 3. Just broke one of the varispeed sheeve halves and was looking at doing a 1:1 conversion...

How is the belt tensioned in your setup?

Later,
Jason
Reply With Quote

  #8   Ban this user!
Old 03-22-2008, 08:45 AM
 
Join Date: Jan 2005
Location: USA
Posts: 2,345
mactec54 is on a distinguished road
Buy me a Beer?

Hi all
How to tension the belt I sloted the motor housing were it mounts on both lugs
the pulleys are then made to size so the belt will just fit on & with the slots
in the motor mount you can ajust the belt

The brake is air operated double acting & has return springs to keep the pads free
of the disc this is operated by the software or a manual switch on the side of the head
__________________
Mactec54
Reply With Quote

  #9   Ban this user!
Old 12-02-2009, 09:01 PM
 
Join Date: Sep 2005
Location: usa
Posts: 62
alex 850 is on a distinguished road

I have a series one boss 5 .I am going to do the same thing you guys have done. I am sick of the noise and the bearings are geting loose again after the last build. Good to know that it can be done.
alex
Reply With Quote

  #10   Ban this user!
Old 12-03-2009, 08:45 PM
 
Join Date: Sep 2005
Location: usa
Posts: 62
alex 850 is on a distinguished road

I am getting ready for the convesion on my series 1 boss 5, it is an 80s model.If some one can tell me what pulleys,belts,and a tensioner i need for this model would be most helpful ,and apreciated,and where to get it.
thanks alex
Reply With Quote

Sponsored Links
Reply




Currently Active Users Viewing This Thread: 1 (0 members and 1 guests)
 
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Yaskawa Varispeed 626 MT bradodarb Phase Converters and VFD 1 04-27-2009 08:38 AM
jpg to dxf conversion jlenelms Machine Created Art 27 11-07-2007 11:20 PM
Yaskawa Varispeed Spindle Drive component ID rbleth51 General Electronics Discussion 66 07-13-2007 04:18 PM
My X1 CNC Conversion zwdeal Benchtop Machines 1 05-21-2007 09:05 AM
r2e4 varispeed with retrofit. najnielkp Bridgeport and Hardinge Mills 5 11-01-2006 09:06 AM




All times are GMT -5. The time now is 12:12 AM.





Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2012, vBulletin Solutions, Inc.
Content Relevant URLs by vBSEO
Template-Modifications by TMS

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136 137 138 139 140 141 142 143 144 145 146 147 148 149 150 151 152 153 154 155 156 157 158 159 160 161 162 163 164 165 166 167 168 169 170 171 172 173 174 175 176 177 178 179 180 181 182 183 184 185 186 187 188 189 190 191 192 193 194 195 196 197 198 199 200 201 202 203 204 205 206 207 208 209 210 211 212 213 214 215 216 217 218 219 220 221 222 223 224 225 226 227 228 229 230 231 232 233 234 235 236 237 238 239 240 241 242 243 244 245 246 247 248 249 250 251 252 253 254 255 256 257 258 259 260 261 262 263 264 265 266 267 268 269 270 271 272 273 274 275 276 277 278 279 280 281 282 283 284 285 286 287 288 289 290 291 292 293 294 295 296 297 298 299 300 301 302 303 304 305 306 307 308 309 310 311 312 313 314 315 316 317 318 319 320 321 322 323 324 325 326 327 328 329 330 331 332 333 334 335 336 337 338 339 340 341 342 343 344 345 346 347 348 349 350 351 352 353 354 355 356 357 358 359 360 361