CNCzone.com-The Largest Machinist Community on the net!



Home Page Mark Forums Read Today's Posts My Replies Classifieds Reviews Photo Gallery Web Links Share Files Advertise With Us Ad List
Go Back   CNCzone.com-The Largest Machinist Community on the net! > CAM Software > BobCad-Cam


BobCad-Cam Discuss all BobCad software here.


This forum is sponsored by:

Reply
 
LinkBack Thread Tools Search this Thread Display Modes
  #1   Ban this user!
Old 05-08-2009, 11:27 AM
 
Join Date: Jul 2005
Location: usa
Posts: 409
cut more is on a distinguished road
V23 run time estimate?

I just upgraded to v23 pro from V21,

Is there a way in V23 to do a run-time estimate? i can't seem to find it if there is.

thanks for any help,
Cutmore
Reply With Quote

  #2   Ban this user!
Old 05-08-2009, 12:31 PM
 
Join Date: Mar 2009
Location: usa
Posts: 175
1234567 is on a distinguished road
run time

post your code and run a simulation in predator editor.Make sure your post has a predator header .


O6270
(BEGIN PREDATOR NC HEADER)
(MACH_FILE=3AXVMILL.MCH)
(MTOOL T1 S1 D4. H5. DIAM_OFFSET 1 = 2.)
(MTOOL T2 S1 D.5 H5. DIAM_OFFSET 2 = .25)
(MTOOL T3 S1 D.75 H5. DIAM_OFFSET 3 = .375)
(MTOOL T4 S1 D.318 H5. DIAM_OFFSET 4 = .159)
(MTOOL T5 S1 D.375 H5. DIAM_OFFSET 5 = .1875)
(MTOOL T6 S1 D.406 H5. DIAM_OFFSET 6 = .203)
(MTOOL T7 S1 D.375 H5. DIAM_OFFSET 7 = .1875)
(SBOX X-.3 Y-1.75 Z-1. L7.66 W1.75 H1.)
(END PREDATOR NC HEADER)
Reply With Quote

  #3   Ban this user!
Old 05-08-2009, 12:57 PM
 
Join Date: Jul 2005
Location: usa
Posts: 409
cut more is on a distinguished road
v23 machining time estimate

1234567,
thanks for the reply,
maybe I missed something or maybe I worded my question poorly,
I am looking to see if there is a way to estimate the machining time with V23.

I can post, I can simulate, but I can't see anywhere that gives me the time for the machining.

Thanks,
Cutmore
Reply With Quote

  #4   Ban this user!
Old 05-08-2009, 01:04 PM
 
Join Date: Mar 2009
Location: usa
Posts: 175
1234567 is on a distinguished road
cycle time

look at bottom right side of uoyr screen there should be a cycle time
Reply With Quote

  #5   Ban this user!
Old 05-08-2009, 01:26 PM
 
Join Date: Mar 2009
Location: usa
Posts: 175
1234567 is on a distinguished road
cycle time

Click image for larger version

Name:	screen shot.jpg
Views:	101
Size:	63.6 KB
ID:	80981

Last edited by 1234567; 05-08-2009 at 01:28 PM. Reason: bottom right ubove tool bar
Reply With Quote

Sponsored Links
  #6   Ban this user!
Old 05-08-2009, 01:30 PM
 
Join Date: Jul 2005
Location: usa
Posts: 409
cut more is on a distinguished road

Thanks for the screen shot,
It doesn't look like I have the ability to backplot under the predator editor. i looked under the lisence menu and there are no checks there.
I will have to call bobcad to check that out I guess.

Thanks,
Cutmore
Reply With Quote

  #7   Ban this user!
Old 05-08-2009, 01:34 PM
 
Join Date: Mar 2009
Location: usa
Posts: 175
1234567 is on a distinguished road
simulation

i have level two undersimulation

Last edited by 1234567; 05-08-2009 at 01:35 PM. Reason: also make sure that if you paid for level two they up grade you key .they tryed to pull that on me
Reply With Quote

  #8   Ban this user!
Old 05-08-2009, 01:40 PM
 
Join Date: Jul 2005
Location: usa
Posts: 409
cut more is on a distinguished road

Thanks,
i am waiting for a call back from Tech suport.
Best Regards,
Cutmore
Reply With Quote

Reply




Currently Active Users Viewing This Thread: 1 (0 members and 1 guests)
 
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Beta Run time estimate barbter NCPlot G-Code editor / backplotter 1 05-30-2008 06:31 AM
How to estimate the value of my used machine 1ctoolfool Haas Mills 5 01-22-2008 10:11 AM
RFQ/estimate question turmite Employment Opportunity 8 09-01-2006 05:33 PM
dry run's time estimate ? lepton TurboCNC 1 07-02-2006 06:02 PM
operation time estimate in setup sheet ? andy55 Mastercam 3 10-06-2005 12:14 PM




All times are GMT -5. The time now is 12:52 PM.





Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2012, vBulletin Solutions, Inc.
Content Relevant URLs by vBSEO
Template-Modifications by TMS

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136 137 138 139 140 141 142 143 144 145 146 147 148 149 150 151 152 153 154 155 156 157 158 159 160 161 162 163 164 165 166 167 168 169 170 171 172 173 174 175 176 177 178 179 180 181 182 183 184 185 186 187 188 189 190 191 192 193 194 195 196 197 198 199 200 201 202 203 204 205 206 207 208 209 210 211 212 213 214 215 216 217 218 219 220 221 222 223 224 225 226 227 228 229 230 231 232 233 234 235 236 237 238 239 240 241 242 243 244 245 246 247 248 249 250 251 252 253 254 255 256 257 258 259 260 261 262 263 264 265 266 267 268 269 270 271 272 273 274 275 276 277 278 279 280 281 282 283 284 285 286 287 288 289 290 291 292 293 294 295 296 297 298 299 300 301 302 303 304 305 306 307 308 309 310 311 312 313 314 315 316 317 318 319 320 321 322 323 324 325 326 327 328 329 330 331 332 333 334 335 336 337 338 339 340 341 342 343 344 345 346 347 348 349 350 351 352 353 354 355 356 357 358 359 360 361