    Hi everyone. I am in need of some help with setting up toolpaths.

    I have started my first 2.5d relief carving on a piece of Cherry and I have a question about the next pass. I ran the first pass as a roughing pass with a 0.5" end mill. I left a 2.00 mm machining allowance. So each pass depth is 0.1". I am now trying to program the next pass but am stuck wandering if I should be doing another roughing pass or start a finishing pass with material left behind. I was planning on using a 0.25" ballnose end mill. Then on my final a 1/16 tapered end mill. Can some one help me out? I have attached photos image of first pass ran and simulated and planned second pass. My machine is not super heavy duty so I am trying to cut it right and not take to much that would cause bog down or tear out. Thanks everyone. Insight greatly appreciated.

    Similar Threads:
    Attached Thumbnails Attached Thumbnails Running a 2.5d project.-roughing-pass-jpg   Running a 2.5d project.-second-pass-jpg   Running a 2.5d project.-image-first-pass-jpg  


  2. #2
    Member awerby's Avatar
    Join Date
    Apr 2004
    Posts
    5728
    Downloads
    0
    Uploads
    0

    Default Re: Running a 2.5d project.

    You could do it either way. If you use a .5" ballnose to do the roughing, you won't have all those "stairsteps" to remove; the cutting will be smoother. I doubt that part has enough detail to warrant a 1/16" cutter; a 1/8" tapered ball endmill would work fine. In that case a second roughing pass certainly wouldn't be necessary, and it would go a lot faster. BTW, this looks like a 3D relief, not a 2.5d project, which wouldn't have rounded contours or require a ballnose cutter.

    [FONT=Verdana]Andrew Werby[/FONT]
    [URL="http://www.computersculpture.com/"]Website[/URL]


  3. #3
    Member ger21's Avatar
    Join Date
    Mar 2003
    Location
    Shelby Township
    Posts
    35538
    Downloads
    1
    Uploads
    0

    Default Re: Running a 2.5d project.

    I agree, go straight to the tapered ballnose.

    Gerry

    UCCNC 2017 Screenset
    [URL]http://www.thecncwoodworker.com/2017.html[/URL]

    Mach3 2010 Screenset
    [URL]http://www.thecncwoodworker.com/2010.html[/URL]

    JointCAM - CNC Dovetails & Box Joints
    [URL]http://www.g-forcecnc.com/jointcam.html[/URL]

    (Note: The opinions expressed in this post are my own and are not necessarily those of CNCzone and its management)


Tags for this Thread

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •  


About CNCzone.com

    We are the largest and most active discussion forum for manufacturing industry. The site is 100% free to join and use, so join today!

Follow us on


Our Brands

Running a 2.5d project.

Running a 2.5d project.