CNCzone.com-The Largest Machinist Community on the net!



Home Page Mark Forums Read Today's Posts My Replies Classifieds Reviews Photo Gallery Web Links Share Files Advertise With Us Ad List
Go Back   CNCzone.com-The Largest Machinist Community on the net! > MetalWorking > 80/20, TSLOTS and other Aluminum Framing Systems


80/20, TSLOTS and other Aluminum Framing Systems Discuss Modular T-Slotted Aluminum Framing Systems here!


This forum is sponsored by:

Reply
 
LinkBack Thread Tools Search this Thread Display Modes
  #1   Ban this user!
Old 03-25-2005, 11:50 AM
 
Join Date: Sep 2004
Location: USA
Posts: 412
Deviant is on a distinguished road
80/20 Specs - Lathe Construction

Does anyone know how flat this stuff is, and over what length?

I don't have access to a large mill, so I was debating on using this along with some mic-6 aluminum plating to build a lathe using thk rails.

Anyone know if this is a good idea?

I saw that 5bears site used it for mill, but also that they took off a bit of the finish to flatten it out.

Any info would be great.

Thanks
Tweet this Post!Share on Facebook
Reply With Quote

  #2   Ban this user!
Old 03-25-2005, 01:15 PM
 
Join Date: Aug 2004
Location: US
Posts: 2,782
ViperTX is on a distinguished road
Check the 80/20 site....I recall 0.001 per foot....I believe that's correct....I don't know if Swede encountered any built in stress being relieved when he machined his stuff.
Tweet this Post!Share on Facebook
Reply With Quote

  #3   Ban this user!
Old 03-25-2005, 01:59 PM
 
Join Date: Sep 2004
Location: USA
Posts: 412
Deviant is on a distinguished road
hmmm,

Do you know if that is straight enough for a lathe bed?

I'm thinking sure the the mic-6 is something like .005 or so.

I haven't built anything like this from scratch before, I'm concerned over finished tolerances.
Tweet this Post!Share on Facebook
Reply With Quote

  #4   Ban this user!
Old 04-04-2005, 11:17 PM
mwp mwp is offline
 
Join Date: Mar 2005
Location: USA
Posts: 28
mwp is on a distinguished road
This is a really good question.

I don't think that the straightness of 80/20 is quite .001/ft. Unfortunately, I can't find the number on their site.

However, here is the link to bosch rexroth's (the brand extrusion Swede used in his mill) catalog section with tolerances:

http://www13.boschrexroth-us.com/ca...ection%2017.pdf

According to that page, it looks like bosch extrusions could be out by up to 1.5mm over 2m (or ~.060 over ~6'). However, I don't think they are usually this bad.

Regarding the flatness of MIC 6, check out this document:

http://www.millproducts-alcoa.com/p...lloys/mic-6.pdf

From my reading, it appears that in the 3/4" inch and up thickness, the flatness tolerance is .005 measured over 8' in one direction and 4' in the other (tell me if you read differently).

So, based on those references, it appears that the extruded profiles are much less straight/flat than the tooling plate. My experience tells me the same thing.

If you try to straighten out the extrusion by machining, clamping it tends to pull it flat while being machined. Then it springs back as soon as it is released. Very frustrating.

I'm interested in hearing what anyone else has to say about this.

Good luck!

Mitchell
Tweet this Post!Share on Facebook
Reply With Quote

  #5   Ban this user!
Old 04-04-2005, 11:22 PM
 
Join Date: Sep 2004
Location: USA
Posts: 412
Deviant is on a distinguished road
The problem is, I don't have a machine large enough to mill in one pass. I'd have to do it in multiple little passes, with reclamping between.

I'm not sure I'd want to do it that way, might be easier to pick up a 4x4 peice of coldroll steel and have a professional shop facemill it for me. That or try my hand at scraping.

*shrugs*
Tweet this Post!Share on Facebook
Reply With Quote

Sponsored Links
  #6  
Old 04-04-2005, 11:46 PM
miljnor's Avatar
S.N.A.F.U.
 
Join Date: Jan 2005
Location: usa
Posts: 1,809
miljnor is on a distinguished road
when I have straighten long peices in house, I have had excellent success, but when you clamp you have to do it 90 deg to the cutting surface. Several vices all trammed in the same planes works well. This way there is no inadvertant straitening done buy the clamps.

Or the best solutions is to send it to a grinder that specializes in dual surface prep. (not neccessarily cheap)

Of course its either time or money.
__________________
thanks
Michael T.
"If you don't stand for something, chances are, you'll fall for anything!"
Tweet this Post!Share on Facebook
Reply With Quote

  #7   Ban this user!
Old 04-05-2005, 08:36 AM
mwp mwp is offline
 
Join Date: Mar 2005
Location: USA
Posts: 28
mwp is on a distinguished road
Originally Posted by miljnor
Of course its either time or money.
Yes, this is usually true. But one measure of a good design is its ability to minimize both.

I've definitely been through the multiple setup milling thing. Yuk.

I've done some thinking about this situation, and come up with the following:

Since the tooling plate is much flatter than the extrusions, use it for the surfaces that need to be flat. But tooling plate in reasonable thicknesses will not be stiff enough for this duty by itself. So the moment of inertia needs to be increased somehow. This is done by attaching extrusion(s) to the tooling plate with epoxy (jb weld?) and moderate pressure (i.e. not enough to deform the tooling plate). Then, after the epoxy dries, bolts are inserted to reinforce the joint. This should keep the slightly bent/warped extrusions from pulling the tooling plate out of line and require no machining. This does mean that anywhere there is a rail mounted, it needs to have a tooling plate/extrusion under it (the rails can not be mounted directly to the extrusion). But you could use two or more extrusions attached to a plate vs one large one (cheaper?). The use of epoxy has the added advantage of increasing joint stiffness.

I'm interested in what anyone else has to say about this idea.

Mitchell
Tweet this Post!Share on Facebook
Reply With Quote

  #8   Ban this user!
Old 04-05-2005, 09:23 AM
 
Join Date: Sep 2004
Location: USA
Posts: 412
Deviant is on a distinguished road
hmmm

I'm not really excited about the jb weld option. If I'm looking at spending money on the extrusions, I'd prefer that they handle the job. Otherwise the money would be better spent on getting a steel tube milled.

I may change the dimensions as I research parts more, but....

My plan was to use two 2x4x30" extrustions parallel to each other with a 4" gap.

Attached to both sides would be a .5" or 1" x6x30" piece of plate aluminum.

This would allow me to have a 4x4x30" passage for a ballscrew.

On the top extrusion, I planned on attaching a .5 or 1" x4x24 plate of cold roll steel. I was going to cut a 45-dovetail the length on both sides to allow attachment of the head and tailstock. Between the head/carriage/tailstock would be a 6" wide bellow to protect the thk linear rails that would run down one of the aluminum plates for supporting carriage.

So, I'd guess really only the plate would need to be perfectly flat, and the steel plate also. I'm just not sure how much they plates will deform when bolted to the extrustions. Might be spending to much money to make it easier on myself.

Anyone know roughly how much it would cost to get a 4x4x30 steel tube milled flat and square on all sides? I'm not sure how long this would take to setup in a professional shop. ((I wouldn't think it would take long))

Last edited by Deviant; 04-05-2005 at 09:31 AM.
Tweet this Post!Share on Facebook
Reply With Quote

  #9  
Old 04-05-2005, 11:16 AM
miljnor's Avatar
S.N.A.F.U.
 
Join Date: Jan 2005
Location: usa
Posts: 1,809
miljnor is on a distinguished road
don't know about the cost on milling but have you considered Blanchard grinding them insted? there setup is fairly neglible, so I would presume cost to be minimum. and the size is nothing for most blanchard grinding shops.

I would think 75.00-150.00 in that area would cover the blanchard grind. and if you are doning multiplu peices the blanchard grind won't increase significantly because all the peices can be done at the same time.
__________________
thanks
Michael T.
"If you don't stand for something, chances are, you'll fall for anything!"
Tweet this Post!Share on Facebook
Reply With Quote

  #10   Ban this user!
Old 04-05-2005, 01:02 PM
 
Join Date: Aug 2004
Location: US
Posts: 2,782
ViperTX is on a distinguished road
I'd total up the external charges before proceeding....
Tweet this Post!Share on Facebook
Reply With Quote

Sponsored Links
  #11   Ban this user!
Old 04-05-2005, 09:54 PM
mwp mwp is offline
 
Join Date: Mar 2005
Location: USA
Posts: 28
mwp is on a distinguished road
Hi, I looked up the actual 80/20 brand spec in my catalog at work--.012"/ft straightness. Not good enough for directly mounting thk rails (without first machining flat) if you ask me. Regarding the steel tube finishing, I recently was quoted $130 to machine rail mounting surfaces on two sides of a 40" X40" weldment made of 4x6 structural steel square tubing. Quote seemed a bit cheap given the amount of work involved, but I do quite a bit of other work with this shop....

Your machine sounds really interesting. What size rails do you plan to use?

mitchell
Tweet this Post!Share on Facebook
Reply With Quote

  #12   Ban this user!
Old 04-05-2005, 10:16 PM
 
Join Date: Sep 2004
Location: USA
Posts: 412
Deviant is on a distinguished road
I'm looking at using a thk shs25 rail.. Assuming I'm patient enough to pick up a pair on the cheap.

I haven't decided if I want to use linear rails on the carriage. May just use a standard gib/dovetail on it.

I'd guess that it would be accurate enough. I'll look more into it, after I get the base.




Originally Posted by mwp
Hi, I looked up the actual 80/20 brand spec in my catalog at work--.012"/ft straightness. Not good enough for directly mounting thk rails (without first machining flat) if you ask me. Regarding the steel tube finishing, I recently was quoted $130 to machine rail mounting surfaces on two sides of a 40" X40" weldment made of 4x6 structural steel square tubing. Quote seemed a bit cheap given the amount of work involved, but I do quite a bit of other work with this shop....

Your machine sounds really interesting. What size rails do you plan to use?

mitchell
Tweet this Post!Share on Facebook
Reply With Quote

Reply




Currently Active Users Viewing This Thread: 1 (0 members and 1 guests)
 
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is On
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Help me buy my first Mini Lathe Highfly Mini Lathe 20 05-10-2005 03:07 AM
OneCNC XR Series Lathe CAD/CAM Released: OneCNC Product Announcements & Manufacturer News 0 03-07-2005 05:20 PM
Just got a taig lathe. anoel Mini Lathe 2 01-18-2005 05:29 AM
Buying my first lathe, Jet, Grizzly, Central, Prazi Noah General Metal Working Machines 9 09-05-2004 11:35 AM
Help with Phoenix cnc wood lathe specs Carver CNC Machining Centers 0 09-29-2003 10:31 AM




All times are GMT -5. The time now is 05:39 PM.





Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2012, vBulletin Solutions, Inc.
Content Relevant URLs by vBSEO
Template-Modifications by TMS

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136 137 138 139 140 141 142 143 144 145 146 147 148 149 150 151 152 153 154 155 156 157 158 159 160 161 162 163 164 165 166 167 168 169 170 171 172 173 174 175 176 177 178 179 180 181 182 183 184 185 186 187 188 189 190 191 192 193 194 195 196 197 198 199 200 201 202 203 204 205 206 207 208 209 210 211 212 213 214 215 216 217 218 219 220 221 222 223 224 225 226 227 228 229 230 231 232 233 234 235 236 237 238 239 240 241 242 243 244 245 246 247 248 249 250 251 252 253 254 255 256 257 258 259 260 261 262 263 264 265 266 267 268 269 270 271 272 273 274 275 276 277 278 279 280 281 282 283 284 285 286 287 288 289 290 291 292 293 294 295 296 297 298 299 300 301 302 303 304 305 306 307 308 309 310 311 312 313 314 315 316 317 318 319 320 321 322 323 324 325 326 327 328 329 330 331 332 333 334 335 336 337 338 339 340 341 342 343 344 345 346 347 348 349 350 351 352 353