Just received the drives, I need any info on how to mount the drives to heatsink or a complete control box design. Also can someone recommend a parallel port breakout board or do I need one. THANKS for any help.
SETUP:
R990mb x 1
R990H x 3
R990io x 1
Power Supply:
toroidal transformer @ prim. 120v 60hz 686va ---- sec. 2*30v 650va
bridge rectifier
I need to know what size capacitor to use for my set up. I have 2 90000uf - 10 + 75%, 50 VDC 65 Surge, 85 CMAX Ambient will these work.
DC Servo Motors:
90vdc
2.6 amp
1/4hp
45:1 ratio
76 rpm
100 in. lb. torque
Still need 2 motors |