Originally Posted by desbromilow Please quote (100) pieces, (will take overruns to use full bar of stock).
Not quoting, just learning the jargon..
does the mention of overruns above mean the buyer will accept delivery of more than the requested 100 units if the process used to make the parts makes a higher number from a standard length of material?
If not, what does it mean?
Des |
Basically the buyer will accept the maximum amount of parts that can be make out of a full bar of stock, if it significantly reduces price. Raw material is much cheaper in full bar lengths in these parts. This type steel is commonly sold in 20 foot lengths, so the the average yield from a full bar would be around 130 parts.