well, here are more pics of my progress. I have finished the x-axis, with the rack in pinion. i have the stepper mounted, blet ran and the racks adjusted. i will probally redesign the motor mount to mount it lower, as i want to build a tray for a wire carrier up there
i also plan on rebuilding the y and z carrage, as those where for mock up. i plan on bringing the y as close to my gantry beam as possible to bring the router more centered in the gantry.
Also on the z axis, i was planning on using 1 car per rail, but i can do 2, but it seamed like over kill and it lessened my travel on the z.
i ordered wires and connectors, and leads screws should be here next week, so i may be cutting in the next month