Well, alot of the goodies and trinkets that I've been ordering showed up today. This included:
- Power supply
- stepper motors
- some timing pulleys and belt material
- idler rollers
- and a heat sink for the geckos that a friend so graciously donated to the project
The drives and power supply will go into the controller box. Now I can start on the long axis drive train. There will be some details on that coming shortly.
The container of M.A.L. didn't come with the order. (
Michelob Assembly Lube)