Originally Posted by duenow That fixed it Scott. The lathe time cycle is still way off gives a 34M time on a job that is less than 1m. But that's ok I can do without that. The mill time cycle is right on. |
I suspect the cycle time issue has something to do with the default feed mode that you have selected (IPM/IPR). Or, it could be off if you're using any of the canned cycles. I know this has been brought up before, but I don't think I ever came up with a good answer for it. If you can, send me a sample program along with the actual cycle time and I'll try to pin this down.
Thanks,
Scott