Originally Posted by skydivebase Just started running some 3d parts for the first time. I'm beginning to realize the lengthy machine times involved.
Q. How long would you be prepared to run your machine at high RPM s. We have a VF1 with a 10K spindle.
Thanks
J |
This question was asked in the "Answer Man" page in the Haas CNC magazine. You could probably find the answer if you went to
www.Haascnc.com and found the back copies of the machine but I recall that the answer was; up to 100% load...indefinitely, 120% load...30 minutes; 150% load...10 minutes.