HU,
I believe your right. The machine time appears to be tied to the cad drawing not the post.
I did a test and here are the results:
z-level rf at .025 depth of cut: time 6 hours 40 minutes.
same at .050 depth: time 5 hours 42 minutes
then radial finish at feed of 24.: time 5 hours 42 minutes
same at feed of 40.: time 5 hours 9 minutes
then same with feed at 80. : time 4 hours42 minutes
So it appears that my system (or circumstances) is at the very least making changes to the time sheet.
__________________ (Note: The opinions expressed in this post are my own and are not necessarily those of CNCzone and its management) |