well i just stripped the end off of my 25 pin connector. Once i got it off i noticed that i could not just look at the connector to see the wire to pins. I had to use the digital multimeter set to 2 ohms and check each pin and find the corosponding colored wire. I wrote them down on a sheet and now I have the wire colors that would need to go to the geckos. Now, I have to know how all the spindle and coolant stuff comes into play? I only have my power supply(65v/20a), 3 geckos(soon to be four for a rotory table) mounted on heatsinks with 2 fans(24v/0.12A). What do i need for the auto spindle on/off speed control and auto flood coolant on/off? I will not be doing the conversion for the extra stuff right now but want to know how to do it for later. Any other extras i would want to think about doing? Where do i get the power for the geckos(5v regulated) and the fans (4 all together 24v/0.12A) ? how do i do an e-stop set up on the out side of the box?Do i need two more power supplies or how do i do this tapping into the computer power for the geckos? I need this info so i can make my box to put this stuff in. |