Here is a picture of the laydown assembly. The wire feeds from the back, and over several very small plastic pulleys, ultimately feeds into a tygon tube and then onto the bobbin. The carriage is on a 40 TPI shaft, and can be repositioned as the coil "fattens". The exit point of the laydown carriage needed to feed the wire directly onto the bobbin. |