I see that you want to use a straight g code on your mazak but would it be unacceptable to run the g code programme as a sub in a mazatrol program then run a circle milling unit after the return to get the bore onsize letting mazatrol do the work for you with the finish e-mill.
It would be a shame not to utilize the things mazatrol does realy well like circle milling.
It would take about 10 minutes to name number and write the program if the g codes ready to go. |